I wanted to run the thread for ‘n’ number of iteration till the duration(6 hours). After 6 hours Jmeter shuts down all the threads . In my case, one of the transaction got started but before the transaction got completed the jmeter shutdown the threads as it reached the configured duration time . Is there a way for the thread to wait till the transaction gets completed ?
Looking for a solution
New contributor
Shyam is a new contributor to this site. Take care in asking for clarification, commenting, and answering.
Check out our Code of Conduct.