I have setup a timeline to follow document versioning. Each group is a document, and each item is a version. Unstacked they line up nicely.
Something I’d like to do is to raise groups of related documents (for example, part of a project) to the top but while I know they can be moved manually, I can’t make them move/reorder programmatically.
For example, in this screenshot I have selected several related documents part of the same release, but I’d like the groups with selected items to move them to the top so they’re together:
I am sure I’m missing something obvious but I can’t figure out why. If it’s animated it would be great but it would be enough just being able to reorder.
All items have an “order” property but right now it’s the same as the ID (which is numeric)